City Terrace · Planned development

Four hillside lots.
One connected vision.

Bonnie Beach Place brings duplexes and detached backyard ADUs together in a coordinated, 16-home hillside development in unincorporated Los Angeles County.

Explore the project

Planning review in progress · Project brief updated October 22, 2026

Bonnie Beach Place: proposed hillside community
Bonnie Beach Place: proposed hillside community · Architectural rendering
16planned homes
4adjacent hillside lots
8duplex residences
8detached rear ADUs

Bonnie Beach Place

More homes.
A thoughtful fit for the hillside.

Four adjacent vacant parcels are planned as one coordinated community. Repeating a duplex-plus-two-ADU program across the lots brings consistency to the design while responding to a steeply rising site.

01 / Street-facing duplex

Two residences above a podium garage.

Each lot includes a two-story duplex over street-level parking. Each duplex residence is planned with 3 bedrooms, 3 bathrooms, and approximately 1,161 square feet of living space.

02 / Backyard living

Two detached ADUs on a higher terrace.

Each rear ADU is planned with 2 bedrooms, 1 bathroom plus a powder room, and approximately 873 square feet. Together, the four residences provide about 4,068 square feet of living space per lot.

Areas and program are approximate and reflect the current project brief; final construction is subject to approved plans.

Four coordinated street-facing buildings across the planned community
Four coordinated street-facing buildings across the planned community · Architectural rendering

Engineering the terrain

A hillside build starts
below the surface.

The grade, structure, utilities, and access are considered together. USCE’s Class A Engineering and Class B General Building capabilities connect civil site work with the buildings above.

661 CY

Planned cut per lot

Approximate earthwork quantity in the current brief.

534 CY

Planned export per lot

Material movement coordinated with the grading plan.

Up to 6 ft

Engineered retaining walls

Retaining structures establish the hillside terraces.

Concrete podium

A structural base for the duplex

Street-level garage construction supports the wood-frame residences above.

The design, from every angle

A cohesive street.
Room to live behind it.

Earth-tone stucco, stone veneer, iron guardrails and gates, private balconies, and terraced stairs connect the buildings to the site. Rooftop mechanical equipment is planned out of street view.

Street approach showing the duplex, podium garage, and hillside terraces
Street approach showing the duplex, podium garage, and hillside terraces · Architectural rendering
Street-facing duplex elevation with stone veneer and garage access
Street-facing duplex elevation with stone veneer and garage access · Architectural rendering
Oblique view of the coordinated façades, balconies, and terraced entry
Oblique view of the coordinated façades, balconies, and terraced entry · Architectural rendering
Wider perspective along the proposed Bonnie Beach Place community
Wider perspective along the proposed Bonnie Beach Place community · Architectural rendering

These are architectural renderings supplied for the planned project, not photographs of completed construction.

One team, start to finish

The path from hillside
to neighborhood.

A six-stage view of the project’s planning, approvals, and intended construction sequence.

  1. 01Project planning

    Site & zoning

    Review the hillside constraints

    R-1 zoning, slope limits, setbacks, and the proposed ADU program informed the site approach.

  2. 02Design coordination

    Design

    Develop a repeatable plan

    USCE worked with YWR Architects on a duplex-plus-two-ADU program that can be coordinated across all four lots.

  3. 03Engineering coordination

    Engineering

    Connect civil work and structure

    The team includes Edifica USA for civil grading and geotechnical/geology reports, and Jose Remon, P.E. for structural design, low-impact stormwater plans, and erosion-control planning.

  4. 04Current stage · In review

    LA County approvals

    Move through agency review

    The current brief reports that LA County Regional Planning accepted the planning application and revised plans were submitted in response to comments. Public Works grading and geotechnical review, building plan check, and fire review are next.

  5. 05Upcoming · After approvals

    Construction

    Build in a coordinated sequence

    Planned sequence: site work and grading; retaining walls and foundations; concrete podium; wood framing, MEP and fire sprinklers; exterior and interior finishes; landscaping and hardscape.

  6. 06Future milestone

    Inspections & occupancy

    Complete the final sign-offs

    USCE’s planned scope includes coordinating County inspections through final sign-off and the applicable Certificate of Occupancy before delivering the homes.

Current project status

Planning application RPPL2026002120 / PRJ2026-002521. Status is based on the client’s October 22, 2026 project brief. Planning acceptance and revised submissions do not mean that all permits have been issued or that construction is complete.

The project team

Coordinated expertise.

General contractor
US Construction Enterprises Corp. (USCE) · Class A & B · CSLB #1032091
Architecture
YWR Architects
Civil & geotechnical coordination
Edifica USA
Structural, stormwater & erosion-control design
Jose Remon, P.E.

From a backyard ADU to a hillside development

Bring your site.
Let’s plan what comes next.

Talk with USCE about your property, plans, and construction scope.

Discuss a similar project Call (626) 736-9147